Tipsa dina vänner om produkten:
Construction Scheduling with Suretrak 3.0 Dr. Mohamed Hegab
Pris
SEK 609
inkl. 6% moms vid leverans till Sverige
Beställningsvara
Förväntad leverans 3 - 17 dec
Julklappar kan bytas fram till 31:e januari
Få avisering om nya utgåvor med Dr. Mohamed Hegab
Lägg till din iMusic-önskelista
eller
Construction Scheduling with Suretrak 3.0
Dr. Mohamed Hegab
The book covers the use of the SureTrak® software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak® is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.
| Media | Böcker Pocketbok (Bok med mjukt omslag och limmad rygg) |
| Releasedatum | 1 februari 2011 |
| ISBN13 | 9781456433123 |
| Utgivare | CreateSpace Independent Publishing Platf |
| Antal sidor | 188 |
| Mått | 10 × 203 × 254 mm · 385 g |
| Språk | Engelska |