Tipsa dina vänner om produkten:
Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes - Production and Logistics Rainer Kolisch 1995 edition
Pris
SEK 569
Beställningsvara
Förväntad leverans 5 - 13 okt
Få avisering om nya utgåvor med Rainer Kolisch
Lägg till din iMusic-önskelista
eller
Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes - Production and Logistics
Rainer Kolisch
Introduces the field of resource-constrained project scheduling. State-of-the-art reviews of optimal and heuristic procedures are provided for classical project scheduling models. Furthermore, new models which are relevant for practical problem settings are introduced.
212 pages, biography
| Media | Böcker Pocketbok (Bok med mjukt omslag och limmad rygg) |
| Releasedatum | 13 februari 1995 |
| ISBN13 | 9783790808292 |
| Utgivare | Springer-Verlag Berlin and Heidelberg Gm |
| Antal sidor | 212 |
| Mått | 155 × 235 × 12 mm · 317 g |
| Språk | Engelska |