Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression - Jason J Cook - Böcker - Biblioscholar - 9781288332021 - 21 november 2012
Om omslag och titel inte matchar är det titeln som gäller

Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression


Få ett e-postmeddelande när artikeln är tillgänglig
Har du en profil? Logga in
Lägg till din iMusic-önskelista
eller

Publisher Marketing: Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency funds. The multiple linear regression model provides better predictions of actual cost overruns experienced. Based on the performance metric used, the model sufficiently captures 44% of actual cost overruns versus current practices capturing only 20% The proposed model developed in this study only uses data that would be available prior to the award of a construction contract. This allows the model to serve as a planning tool throughout the concept and design phases. The model includes project characteristics, design performance metrics, and contract award process influences.

Media Böcker     Pocketbok   (Bok med mjukt omslag och limmad rygg)
Releasedatum 21 november 2012
ISBN13 9781288332021
Utgivare Biblioscholar
Antal sidor 68
Mått 189 × 246 × 4 mm   ·   140 g